Inside Out Library

Instructions for installing and operating the Thomson recording watt-meter. (1896)

General Electric Company · General Electric Company, Nela Park Engineering Department, · leaf 17

An illustration from Instructions for installing and operating the Thomson recording watt-meter., 1896, leaf 17
cut-out to the mains. The cut-out in the meter is so adjusted that it will short circuitboth the meter and the lamps with an excess of approximately 100volts above the rated capacity of the meter, and in order to startthe lamps again, it will be necessary to throw off the current bymeans of the… … Fij,Mii<» VII.Station Arr Mittor. (Onnccl llie nu-lci tield 1>\ means (jf ihc two outside terminals,in series with one side of llie line, connecting the left-hand terminalto the generator. Conned the middle binding post of the meterto one terminal of the rlieostat and the other terminal of…

Electrical engineering · Electric meters · Electricity metering

Internet Archive · Building Technology Heritage Library · Public Domain Mark 1.0. Free to use for anything.

More pictures from Instructions for installing and operating the Thomson recording watt-meter.

More like this