t is now called the cable of 1880. The An improvement in that class of railway car trucks in | cable laid in 1873 was broken April 2, 1879, and was repaired CIPLES. which the brakes are not applied to the flanged running in the same month; it is now in operation. No break has wheels, but to small… … two studs on one end, the runs to the bottom of the studs engaging with a cross curve, where the ball is bar on the shaft, and the ris- dropped, the increased mo- ing flanges sliding on adjustable projections of the frame, {now working, which were laid by the company, one has been mentum from the…
Internet Archive · Public domain (published before 1931). Free to use for anything.