only proof covering. The asbestos partial, and covered merely fire-felt is laid over wire cloth the engines and boiler spaces, which is attached to a frame- the ends of the vessel being work of light angle-bar, car- unprotected. This is a me- ried between the _ ship’s thod of construction whose… … Other evidences of the per cent. These changes are thoroughness with which Na- expected to result in an in- val Constructor Bowles has crease of the vessel’s speed earried out the work of fire- from 15% to 174 or possibly proofing is further seen in 18 knots speed. the new metal rifle racks for The…
Internet Archive · Public domain (published before 1931). Free to use for anything.