carloads of rip-rap, and 5 carloads of rim-filling drainage and sewerage. When the grade-raising is completed to the level of The board of engineers selected for the purpose were rods. Work on the grade-raising has been in progress fif- the top of the wall, the top of the embankment for Gen. Henry… … Street. Steamer. A CURIOUS DRAWBRIDGE ACCIDENT AT MILWAUKEE. pavement, and 40 feet further by soil and Bermuda engineers of national renown. to be completed early in 1907. The plan for filling in, grass. Thus a fine driveway will be the result, 50 feet board submitted plans calling for the…
Internet Archive · Public domain (published before 1931). Free to use for anything.