Inside Out Library

Architect and engineer (1905)

San Francisco : Architect and Engineer, Inc · leaf 228

An illustration from Architect and engineer, 1905, leaf 228
ovided tospeed up the em- that all of the 550tons of steel in itsframe - work arefield bolted, in-stead of being riv-eted together. Thismakes possible theeasy removal ofthe structure, ifdesired, when theBay Bridge is com-pleted. The term-inal is under onemammoth roof andcovers 10.000square feet of… … TRAIN CONCOURSE BUILDING. KEY SYSTEMPIER TERMINAL. OAKLAND. CALIFORNIA Kent and Hass. Architects ^ n ►

Architecture · Building

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from Architect and engineer

More like this