San Francisco : Architect and Engineer, Inc · leaf 441
gale started was sunk, but onlyone concrete caisson failed to weather the journey. After the gale subsided, the work of construc-tion continued as before, though a long spell ofrough water prevented pier equipment from beingtowed over, so that the harbor was not unloadingto maximum capacity until… … SINCE 192 5 Western AsbestosCo. has made over three thou-sand installations of CelotexSound Conditioning. This ex-tensive experience is availableto architects and engineers. f:9* WESTERN ASBESTOS CO. SAN FRANCISCO, OAKLAND, SACRAMENTO, RICHMOND, CAIIFORNIA of all sizes have moored within its…
Architecture · Building
Internet Archive · Public Domain Mark 1.0. Free to use for anything.