The Architect & engineer of California and the Pacific Coast (1905)
San Francisco, Calif. : Architect and Engineer Co · leaf 93
g to Engineer-ing News, this sliding was a maximum at a joint /; and running out to nothingat c and d The crack at a opened 4 inches; at h, \l/\ inches; and at e and /,2l/2 inches at the bottom on the downstream face, but pinched nearly togetheron the upstream face. The reservoir was then emptied… … Bayless Dam After Dynamiting in 15
Architecture · Building
Internet Archive · Public Domain Mark 1.0. Free to use for anything.