Inside Out Library · Explore

Cassells' carpentry and joinery (1907)

Hasluck, Paul N. (Paul Nooncree), 1854-1931, ed · Philadelphia, D. McKay · leaf 523

An illustration from Cassells' carpentry and joinery, 1907, leaf 523
the rod, and plug the walls toreceive them. The best way to do this is todrive plugs at the required height from thefloor at each end of a bay, and resting aplumb-rule in the rebate of the top grounde (Fig. 1608), plumb it upright, and with apiece of the thin ground as a gauge drive inthe plug… … Fig. 1609.—Detail at A A (Fig. 1606). should remain as given—namely, 9 in. Asthere is a skirting fillet, an extra fit for thelower edge of the plinth is not necessary.Fixing the Sham Dado.—If this dado is tobe prepared at a shop some distance fromthe building where it is to be fixed, the pre-pared…

Carpentry · Joinery

Internet Archive · Library of Congress · Public Domain Mark 1.0. Free to use for anything.

More pictures from Cassells' carpentry and joinery

More like this