ks beforebeing covered in and very little cleaning out of the tank is necessarywith this arrangement. 140 LAKE SHIP YARD METHODS OF On tlie sides of the vessel all the work is also cleaned up beforethe shell or tank at side is put on, thus cleaning up all the inside workbefore covering same up. The… … Fig. 154. The inside work runs about three per cent less for the straightaway work. On the great lakes $2.50 is paid for five-eighths diameter, $3.00for three-fourths, $4.00 for seven-eighths and $5.00 for inch rivetswithout any bolting up. The inside work runs the same for flush work by hand. All…