Lake ship yard methods of steel ship construction (1907)
Curr, Robert · Cleveland : The Marine review · leaf 162
The four top side strakes of the plating of the hull are doublestrapped and quadruple riveted. Within the range of the double bottom the shell is also double-strapped* treble riveted inside, and double riveted outside and thebutts of the keel plates are treble riveted. Wherever possible, hydraulic… … Fig. 164. 152 LAKE SHIP YARD METHODS OF would bring the surface as closely together as possible before riveting.In this way there was absolutely no possibility of yielding when therivets were put in. The work done by hydraulic power includes thecenter girder, keel-plate garboard strake, the center…
Naval architecture · Ships, Iron and steel
Internet Archive · Cornell University Library · Public Domain Mark 1.0. Free to use for anything.