entirepreparation goes on as the cloth hanes on the frame-work and requires three days for completion, the sizing;nd the two sides of coloring each requiring a day todry. The machine used accomplishes the entire preparationof the shades from the sizing to the finished length. The•doth is first… … hanging over a pole and after dropping almost to thefloor, passing up over another pole sufficiently distant tokeep the folds apart, and s:> on. The length of the fac-tory hung in this way will contain two and a half milescf shade (doth, and seven miles of it can be turned outin a day. After the…
Fashion
Internet Archive · Thomas Fisher Rare Book Library · Public Domain Mark 1.0. Free to use for anything.