Elementary building construction and drawing : stage 1 (1907)
Burrell, Edward J · London : Longmans Green · leaf 163
n-water pipe. These cesspools are wooden boxes sunk below the boarding the full width of the gutter, about 9 inches deep and 18 inches long, according Fig. 207. to circumstances. They are lined with lead to within a short distance of the top. The edges of the gutter sheets are then dressed over in… … or two parts of a roof. Fig. 208 shows a secret gutter m the former position. The rafter is kept about 2 inches away from the brickwork. Along the edge of the boarding is nailed a wood roll or triangular fillet. A sheet of lead is then dressed over the roll and formed
Building
Internet Archive · Getty Research Institute · Public domain (published before 1931). Free to use for anything.