Handbook of construction plant, its cost and efficiency (1914)
Dana, Richard Turner, 1876-1928 · Chicago, The M. C. Clark Publishing Co. · leaf 151
cleaning brush was attached to the discharge end of 146 HANDBOOK OF CONSTRUCTION PLANT the conveyor. This brush was belt driven from a small pulley onthe shaft of the end pulley of the conveyor. Hullett-McMyler Cantilever Crane or Conveyor. This machineis illustrated in Fig. 70 and was used on the… … Fig. per minute does the hoisting. The total weight of the crane is110 lbs. and its cost is about $9,000. The daily (10 hours) ex-pense of operating each crane was: 1 engineer $ 2.50 1 fireman 1.50 Machinist service 1.00 Superintendence 75 1 V-l tons coal 2.50 Oil and waste 25 Repairs (?) 50 Track…
Contractors' operations · Building
Internet Archive · Library of Congress · Public Domain Mark 1.0. Free to use for anything.