Inside Out Library · Explore

Handbook of construction plant, its cost and efficiency (1918)

Dana, Richard Turner, 1876-1928 · New York, McGraw-Hill book company, inc., [etc., etc.] · leaf 150

An illustration from Handbook of construction plant, its cost and efficiency, 1918, leaf 150
leaning brush was attached to the discharge end of 146 HANDBOOK OF CONSTRUCTION PLANT the conveyor. This brush was belt driven from a small pulley onthe shaft of the end pulley of the, conveyor. Hullett-McMyler Cantilever Crane or Conveyor. This machineis illustrated in Fig. 70 and was used on the… … Fig. 69. per minute does the hoisting. The total weight of the craifie is110 lbs. and its cost is about $9,000. The daily (10 hours) ex-pense of operating each crane was: 1 engineer $ 2.50 1 fireman 1.50 Machinist service 1.00 Superintendence 75 1 % tons coal 2.50 Oil and waste 25 Repairs (?) 50…

Contractors' operations · Building

Internet Archive · Library of Congress · Public Domain Mark 1.0. Free to use for anything.

More pictures from Handbook of construction plant, its cost and efficiency

More like this