166 RECENT PROGRESS IN BOILER INSTALLATION. gether with a study of this and similar charts clearly indi- cated the advisability of increasing the thickness of fires, as it was quite evident that the rear end of the grate was in- sufficiently sealed. … Figure No. 17. Furnace Reconstruction at United Railways Co. Central Power House. The maximum furnace temperature obtained was 2,000° Fahrenheit. Figure No. 12, shows the results of a test several days later. These curves follow the same general form as those