e length of the pile, so that in a close estimate for longer or shorter piles they should be separated out or allowed for by inspection. As it assumed in the estimate in the last column that 5! piles are driven in 8 hours, the total cost for harder or softer ground can be estimated by assuming the… … 300 ISO 200 250 300 360 Number , of Blows . Fig. 12. Typical Pile Curves. The full curves in Fig. 12 show the portion of the driving where the water pressure was on and the dotted lines the driving after it had been cut off by the filling of the pipe at the tip of the pile. This stoppage was not…