Engineering problems in electric elevated and suburban railroading (1899)
Sprague, Frank J. · s.n., · leaf 20
t, thenthe right remained with the Railway Company to cancelthe contract. Should the test prove satisfactory, the carswere to be delivered wherever required for further tests,the remaining 114 equipments to be progressed to com-pletion by specified dates, and as soon as the South Sidepower house… … SOUTH SIDE ELEVATED RAILWAY OF CHICAGO. 7 days, and be made in such manner as required by and tothe satisfaction of the president and engineers of the com-pany. Tn the event of these equipments proving mua isfac-tory to any one of them, the company still had the right tocancel the contract, and to…
Local transit -- Design and construction -- 19th century · Electrical engineering -- Safety measures -- 19th century