Inside Out Library · Explore

Mechanical equipment of buildings; a reference book for engineers and architects (1916)

Harding, Louis Allen, Willard, Arthur C. (Arthur Cutts), 1878-1960 · New York Wiley · leaf 208

An illustration from Mechanical equipment of buildings; a reference book for engineers and architects, 1916, leaf 208
ney = 20 base, 125 = 25, 150 = 25 or 30, 175 = 30, 200 = 35,225 = 40. A point to be borne in mind also is that there should be at least 3 feet of base above top ofbreeching entrance. *NoTE.—Concrete foundations cost approximately $5.00 to $6.00 per cubic yard in place. CHIMNEYS FOR POWER BOILERS… … --Cement Head withW.I. Ring See PlateNo.2 for detail BlJg Typical Plan of, Square Baseforming Part of Building Wall Building Wall bondedInto Base of Chimneyby means of Slip-Joint

Building · Heating · Ventilation

Internet Archive · University of Toronto, Robarts Library · Public Domain Mark 1.0. Free to use for anything.

More pictures from Mechanical equipment of buildings; a reference book for engineers and architects

More like this