Pedlar Metal Roofing Co · Oshawa, Canada : The Pedlar People Limited · leaf 89
astering After the Truss Fabric is affixed to the walls prepareand apply the finish. FIRST COAT—One part of Portland Cement, twoand one-half parts clean sharp sand. FINISH COAT—Same proportion. This finish coatmay be pebble dash or stippled, or otherwise roughenedin which case the pebbles must be… … The above is a half-tone of one of many reconstructed residencesin Toronto. It was originally an ordinary brick residence, but thebricks having scaled and sheared, expanded metal was attached tothem and the whole exterior plastered with cement. The plate speaksfor itself. THIS IS WHERE TRUSS FABRIC…
Pedlar Metal Roofing Co · Architectural metal-work · Architectural design · Building, Iron and steel · Commercial
Internet Archive · University of Toronto Libraries · Public Domain Mark 1.0. Free to use for anything.