t below the sur- pipe in a semi-liquid state, and readily carried to the face of the water, in order to secure sufficient "filling" average depth of the harbor to be at least 35 feet. An idea of the extent of the project can be gained point of discharge. Each of the excavators is moored for the… … Agitator Lilted, Showing Design of Cutting* Head. The Agitator and Suction Pipe Submerged and in Operation. BUILDING A TOWN SITE BY SUCTION DREDGE.
Railroad · Apparatus · Going · Chicago · Eclipse · Scientific American · Patents · Three holes · Sheet metal · American museum · American institute · White star · Three times · Long island · Street railway · Safety devices
Internet Archive · Public domain (published before 1931). Free to use for anything.