he Suez Canal Company for enlarging the canal to double its original size; the work to be carried out in sections, and upon such a basis that the service of the waterway would not be interfered with. An appropriation of $5,000,000 was made for this purpose in 1901. This scheme has been The Entrance… … In addition to this, the extent of the dredging neces- sary at Port Said aggregated during the same period Excavating for the New Docks at Port Said. A Pontoon Kock 1,933,348, 1,842,772 and 1,464,935 cubic yards respec- tively. In 1904 a minimum depth of 28 feet was maintained for the whole…
Manufacturers · Egg · Gas · Corona · Engines · Machinery · Gas engines · Scientific American · Van winkle · Square foot · Cubic yards · Total eclipse · Gas engine · Wind pressure · Water level · American july
Internet Archive · Public domain (published before 1931). Free to use for anything.