A treatise on architecture and building construction (1899)
International Correspondence Schools · Scranton, The Colliery engineer co. · leaf 124
of fastening is neat and re-liable. All hooks or bands shouldclasp the pipe close underthe hub, or around it, andshould not be placed midway between the joints, if it is pos-sible to avoid it. Fig. 69. 16 PLUMBING AND GAS-FITTING. 113 If the pipes stand in a chase or groove in the wall, they maybe… … Fig. 70. 187. Care must be taken that the fastenings are soarranged that the pipe will be free to contract and expandwith the changes of temperature without loosening itself,or tearing the fastenings loose from the walls. Buildingsare always liable to settle, and this must be kept in mindwhen…