Bridges, structural steel work, and mechanical engineering productions (1909)
Sir William Arrol and Company, Ltd · Sir William Arrol and Company, Ltd · leaf 142
fourcylinders, braced, on both the transverse and longitudinaJtoes by ties extending 20 ft. below water level. Hie girder framework, for carrying the roller path. * Pivot, and the live rollers ofthe swing span was 111 upon the main capsill girders resting on the top .. ill. ■ilKllKK WORK. A 1 the… … The Viaduct over the River Barrow. <»• grouted the bed-stones of the main capsill girders beinjup. The support for the circular track for the live roller-ring was thus made perfectly true to level. The concretingwas then completed, and its surface coated with asphalte.At the centre of this…