Inside Out Library

Building material catalog no. 102 (1913)

Chicago House Wrecking Co. · Chicago House Wrecking Co. · leaf 76

An illustration from Building material catalog no. 102, 1913, leaf 76
nail heads, leaving a smooth surface over which to apply the decoration. It requiresapproximately 1 pound of crack filler to every 150 lineal foot of Ceil-Tite Board. After thefiller has set three or four days, scrape it off smooth, then give it a coat of shellac.SHIPMENTS CEIL-TITE Board is packed… … APPIIOATION CEIL-TITE Board is apnlied directly HrrLIVHIlUn to the studding and joists. Headersshould be placed not over five feet apart and also that all fouredges of the board may be nailed securely. The ceiling boardsshould be applied first and reach clear to the wall studs,permitting the wall…

Building materials · Plywood doors · Wood stile and rail doors · Painting · Acoustical panel ceilings · Linear wood ceilings · Construction tools

Internet Archive · Building Technology Heritage Library · Public Domain Mark 1.0. Free to use for anything.

More pictures from Building material catalog no. 102

More like this