Foundations, substructures and subaqueous works. (1914)
Foundation Company Limited · Foundation Company Limited · leaf 38
Looking Down Shaft iflontreal Cfje Jfounbation Company, Himiteb T^ancoutoer f THE tunnel shown on the opposite page was built by TheFoundation Company, Limited, for the Aluminum Co. ofAmerica, at Shawinigan Falls, Que. This work consistedof a 13 foot diameter tunnel, 1100 feet long, driven through… … Tunnel for Aluminum Compam of Vmeri frlontreal QTije Jfounbation (Company, Htmiteb l^ancouber THE C.P.R. Grain Elevator at North Transcona, Manitoba,which was originally built on floating foundations, recentlyfailed due to overloading of the soil, causing the bins tosettle and list to an angle of…
Foundations · Bridges
Internet Archive · Building Technology Heritage Library · Public Domain Mark 1.0. Free to use for anything.