Inside Out Library · Explore

Portland cement sidewalk construction (1909)

Universal Portland Cement Co., C. W. Boynton · Universal Portland Cement Co. · leaf 47

An illustration from Portland cement sidewalk construction, 1909, leaf 47
them in fair weather,such walks become impassable when iced over during the winterseason. Wooden walks are then laid over the cement to pro-vide a surer foothold, but this expedient should be unnecessary.Steps should be built if the grade exceeds 20 degrees, but lessergrades are improved by laying… … Figure 24. Change of Grade. The comfort of pedestrians demandsthat the grade in a walk shall not change suddenly except-ing where steps are advisable. It is not unusual to find a breakin continuity of the grade such as is illustrated m Figure 24.Here the higher walk was built last and is connected…

Concrete · Concrete forming · Cast-in-place concrete · Structural concrete · Architectural concrete

Internet Archive · Building Technology Heritage Library · Public Domain Mark 1.0. Free to use for anything.

More pictures from Portland cement sidewalk construction

More like this