San Francisco : Architect and Engineer, Inc · leaf 338
place through the openend. When the caisson is in place the open-ing of the shoe will be closed and theentire floor between the fender walls willbe covered with a sand cushion, into whichthe caisson will be sunk. The caisson then will be sunk until itrests on the rock bottom of the excavationand…
Architecture · Building
Internet Archive · Public Domain Mark 1.0. Free to use for anything.