San Francisco : Architect and Engineer, Inc · leaf 280
The power-house dam as seen from the downstream side. Over the roads in the foreSn-und cnn<iantly rollStandard Oil trucks with fu€< and lubricants used by the contractors. When the project is completed, theseroads will be buried beneath water flowing through the power-house above the dam. … A recent photograph of the power-house dam, across the river channel on the Oregon side. The view is of theupstream face: during construction the water of this channel has been diverted. The power-house at this pointwill generate 115.OCX) horsepower, or 86.000 kilowatt:>: later this output may…
Architecture · Building
Internet Archive · Public Domain Mark 1.0. Free to use for anything.