Inside Out Library · Explore

Architect and engineer (1905)

San Francisco : Architect and Engineer, Inc · leaf 416

An illustration from Architect and engineer, 1905, leaf 416
ing the bridge equalsthe displacement of 10 first-line battleships of33,000 tons each. . . . The 100,000 tons of steel required to buildthe bridge would fully load a freight train 20 mileslong. . . . Concrete used would build two 10-foot side-walks on either side of the highway from Omahaio… … Comparative drawing of Golden Gate Bridge with othenotable bridge structures MARCH, 1937

Architecture · Building

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from Architect and engineer

More like this