San Francisco : Architect and Engineer, Inc · leaf 377
, ground enclosurewalls, service roadway, and walks and curbs. The first concrete was poured on December6, 1941, and the superstructure of the hospitalwas completed within five months. The gen-eral contractor had the benefit of his ownequipment for practically all of the work,including excavation.… … six trucks carrying three to five batches at atime were available. Concrete for the buildings was mixed at thepoint of placement. The maximum number of workers employedwas 1,000. Recognition of the exceptional ef-forts of the general contractor, R. E. Campbell,to expedite the work, was given in the…