es of weld wasnecessary to finish the hotel. Thirty thousand poundsof mild steel welding electrodes were used on the job. The hotel has 70 rooms in four of its wings; dormitoryin each of two other wings; dining hall and kitchen inthe seventh wing. The hotels huge dome will seat 1600people. All of… … Aerial photograph of completed building 6 Hobart Bros, lines were put into a box and insulated. Since theselines supplied hot and cold water, steam heat andsewerage, they had to be separated by insulation. The floor is reinforced concrete six inches thick.Junior six inch I beams were used on the…