Inside Out Library · Explore

Architect and engineer (1905)

San Francisco : Architect and Engineer, Inc · leaf 164

An illustration from Architect and engineer, 1905, leaf 164
position that whenan architect renders a final decision, under abuilding contract of this character, he has ex-hausted his power on the point covered. Perforce the parties to the contract are boundthereby, and, in the absence of fraud or mistake,the architect may. not thereafter reverse his… … Granular mineral wool insula-tion being pneumatically ap-plied to a roof. After thespace between joists is filledto a depth of four to six inch-es, the roofing material is re-placed and made water-tight. INSULATION By HENRY J. WINGATE, Architectural Engineer Now that the homebuilding industry is…

Architecture · Building

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from Architect and engineer

More like this