concrete andstarted pouring the wall panels. There were 44wall panels in all. Concrete for them, as well asfor the whole Sylvania project, was supplied bythe peninsulas Carl E. Anderson company. Cardarelli let the wall panels cure for 10 days.Then truck cranes wheeled along side, gingerlypoked… … S4 ARCHITECT AND ENGINEER tons, was six inches thick, and measured 20-by-21feet. Each had to be first tilted, then literallysnaked out backwards between the roof supports,which were spaced substantially less than a pan-el-width apart. All in all it was quite a feat . . .took only an average of 13…