trol equipment around October 1. The electricload will be much greater than that for black-and-white TV broadcasting, requiring 1000 kw of elec-tricity for stage lighting, 500 kw for technical services,and 500 kw to run the air conditioning system, whichcalls for 450 tons of refrigeration. TV… … Shown here are the two tiers of20 ft. wide precast concrete wallpanels that make up the 46 foothigh walls. The wooden strips on the interiorof the panels are the nailersto which acoustical materials orelater fastened. Using up to the minute construc-tion techniques some eighty-fourprecast concrete…