San Francisco : Architect and Engineer, Inc · leaf 555
of two buildings (one at San Mateo,the other at Redwood City) was discussed by AugustE. Waegemann, San Francisco Consulting Engineer.The building at San Mateo involved tilt-up walls withpoured columns supporting bow string trusses of 110foot span at 20 feet on center. The trusses were con-nected to… … of the column. Prior to erection of the trusses, thewall panels were known to be out of line from Vato 1; after the failure the walls were all within ap-proximately J/g of being truly in hne. Trusses wereevidently erected and braced in a standard manner,and a subsequent check indicated that the…
Architecture · Building
Internet Archive · Public Domain Mark 1.0. Free to use for anything.