San Francisco : Architect and Engineer, Inc · leaf 61
I Ceramic Veneer units must be soaked inclean water for one hour before using. Wallsurface should also be damp at time of setting. 2 Immediately before setting, the back of theCeramic Veneer unit should receive a brushcoat of neat Portland cement and water. 3 To insure permanent bond between… … 4 Next, slightly more than % of an inch ofmortar is applied to the C.V. unit. The sameamount is also applied to the wall area. 5 The C.V. unit is then set in place. Excessof mortar will be forced out of joints from theback, leaving a ?4 inch mortar bed.
Architecture · Building
Internet Archive · Public Domain Mark 1.0. Free to use for anything.