Inside Out Library

Architect and engineer (1905)

San Francisco : Architect and Engineer, Inc · leaf 278

An illustration from Architect and engineer, 1905, leaf 278
mber while being held by thecranes since the splice connections could be securelylined up with drift pins. As the bolts tightened, thesections came into perfect alignment. When completed, sometime this fall, the hangarwill provide 153,000 square feet of floor space forturn-around line maintenance… … TESTING CALIBRATIONS on high tensile bolts used to splice flanges of 365-ft. girderswhich cantilever 142-ft. each way.

Architecture · Building

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from Architect and engineer

More like this