Inside Out Library

Building construction and superintendence, by F.E. Kidder ... (1896)

Kidder, Frank E. (Frank Eugene), 1859-1905 · New York, W.T. Comstock · leaf 356

An illustration from Building construction and superintendence, by F.E. Kidder ..., 1896, leaf 356
ece, or on the wallor ceiling, are usually run in place by hand. The process con-sists in placing on the surface of the wall or ceiling a sufficient bodyof plaster and forming the mould by running along it a sheet irontemplate, cut to the reverse profile of the mould. The template isstiffened by… … Fig. 232. finishing coat of plaster is applied, as it is necessary to fasten light pinestraight-edges on the wall to form guides for the templates. In run-ning the moulding two men are generally required, one to put on theplaster as it is needed and the other to work the template, which gen-erally…

Building

Internet Archive · Public Domain Mark 1.0. Free to use for anything.

More pictures from Building construction and superintendence, by F.E. Kidder ...

More like this