Inside Out Library · Explore

Building construction and superintendence (1909)

Kidder, Frank E. (Frank Eugene), 1859-1905, Nolan, Thomas, 1857-1926 · New York : W.T. Comstock · leaf 59

An illustration from Building construction and superintendence, 1909, leaf 59
s of the joists aresupported on a wooden girder it is cheaper and stronger to let thejoists rest on top of the girder, but this often interferes with the head-room in the cellar and it permits of more settlement from shrinkagethan if a flush girder were used. If the joists are framed flush intothe… … Fig. 28. spike driven down through the top of the girder into the tenon.These proportions (which are in terms of the depth) give the great-est strength for both the beam and girder. Any cutting into a beamor girder should always be as near the centre line or neutral axis aspossible, as the nearer…

Building

Internet Archive · University of Connecticut Library · Public Domain Mark 1.0. Free to use for anything.

More pictures from Building construction and superintendence

More like this