Inside Out Library · Explore
Buildings (1922)
Chicago : Engineering and Contracting Pub. Co. · leaf 113
portion cut off. Bythis means the unaccounted for consumption is located between valves. These tests aremade between the hours of 1 and 5 a. m., for,at that time, the consumpti©n is at a minimumand the rate of flow usually nearly constant. The sections using the unaccounted foramount are inspected… … Map Showing Division of Memphis, Tenn., Into Sections for Water Waste Survey. July 26, 1911. ENGINEERING & CONTRACTING 99 TABLE I.—RESULTS OF WASTE WATER INSPECTION AT District Number. 1 Area in acres 134 Metered population 1.N09 Unmetered population 2,053 Total population 3,862 Metered supply,…Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.
More pictures from Buildings
More like this