Chicago : Engineering and Contracting Pub. Co. · leaf 123
500 kw $35,000 $35,000$5.40 Total.6,500 kw.$174,200352.500 53,600105,90027.30056,60049.60035,000 $854,700$132.00 each station were arrived at by comparisonof the installed capacity and the acre-feetpumped during the season of 1910, with thestations and it is found that the figures thusobtained… … PER CENT OF GATE OPENING Fig. 2—Curves Showing Results of Tests of125 Ft. Per Sec. Centrifugal Pump. each station by multiplying the total acre-feetfor that station by the approximate net lift,namely, 30 ft. The results of last seasonsrun showed that the kilowatt-hours generatedat the power plant…