Inside Out Library · Explore

Buildings (1922)

Chicago : Engineering and Contracting Pub. Co. · leaf 160

An illustration from Buildings, 1922, leaf 160
f the cross-section. The section thatis completed is about 600 ft. in length, and forhalf a mile above this point, the work is mere-ly a clean-up job on which three steamshovels are making shallow cuts. The old in-cline into the Canal at Bas Obispo on theeast side is being dug out. There has been… … Ay/7//?er/(8/n /h>/> Surface af/fo/er ffatffffo//om ofGano/. £/er *40fat 320 280 240 700 I60~I20 00 40 O 40 SO //O /SO 2)0 240 ?£0 300X0/T/?f. s Conttf. Section of Culebra Cut, Panama Canal, Showing Completed Canal at Bas Obispo. sides are cut with a bevel. This has no ad-vantage over that…

Buildings

Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.

More pictures from Buildings

More like this