crete upin buckets was slow it was not a great dealmore expensive than wheeling. The cost oflarge cistern was as follows:CONCRETING. Base: BUILDING FORMS FOR WALLS. 1 carpenter 62 hrs. at 30 cts $18.60 2 carpenters 62 hrs. at 20 ets 24.80 2 laborers 39 hrs. at 15 cts 11.70 $55.10 This gives a cost… … Design of Cast Iron Drainage Con-duits, Ventnor City, N. J. BY WARNER I. RISLEY.* In Ventnor City, N. J., all rainfall is takencare of by surface drainage. The main street,Atlantic Ave., is the backbone of the system inthat all water falling on the north side of saidavenue drains to Inside…