Inside Out Library · Explore

Buildings (1922)

Chicago : Engineering and Contracting Pub. Co. · leaf 200

An illustration from Buildings, 1922, leaf 200
Fig. 1—Fuse Meter. August 16, 1911. ENGINEERING & CONTRACTING of the plungers, which was not found to bethe case with the first set of plungers manu-factured. With this new instrument, the re-lation between the three plungers is exactly1:10:100, and this ratio remains constant ir-respective of… … ■ Rubber Tube ,~5gmi Mercury -5mms. 81 fomen-?,4-mm. Air Spaa *— Copper Gauze Magnesia-AsbesrosPipe Covering Fig. 2. stance, the number of grams required to forcethe plungers into the material at the uniformspeed of 1 cm. per minute is directly propor-tional to the volume displaced. The…

Buildings

Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.

More pictures from Buildings

More like this