Chicago : Engineering and Contracting Pub. Co. · leaf 23
ill be madeon the above work. After the ground has been cleared as speci-fied above, it shall be excavated or filled, as-may be required. All embankments shall bemade of suitable material, spread in layers-not exceeding 1 ft. in thickness. Thecontractor shall furnish all material for em-bankment…
Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.