Inside Out Library · Explore

Buildings (1922)

Chicago : Engineering and Contracting Pub. Co. · leaf 438

An illustration from Buildings, 1922, leaf 438
aterially reduced by purchasing a lowboitand a number of barges not entirely new. The open season is from about April I toNovember 15, but certain portions of thework may he done on the ice in winter if thecontractor desires. :ober 18, 1911. ENGINEERING & CONTRACTING 423 ie rates of pay on… … 11—Launching a Mattress From Grasshopper Boat. he usual day is 12 hrs., but when day andit runs are made it becomes 24 hrs., andcrew is doubled, with the exception ofwatchman, cook and cabin boy.n the quarterboat and building boat, with8-hr. day and with subsistence, exceptlaborers, who usually pay…

Buildings

Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.

More pictures from Buildings

More like this