Chicago : Engineering and Contracting Pub. Co. · leaf 45
ice consisting of astiff arigle which is clamped along the topedge of the plates and is long enough to reach Reichert metal forms was $5,500, which, to-gether with the estimated labor cost at 2 cts.per sq. ft. or $3,000, made a total estimatedcost of metal forms of $8,500. The work hasbeen, at the… … height of 75 ft. The forms consist of sheetmetal reinforced with small angles as shownby Fig. 2. They are made by the ReichertManufacturing Co., of Milwaukee, Wis. Fig. 1 is« a view of the building with the forms inplace. The plates of the forms are of vary-ing lengths, ranging by 2-in. increments…
Buildings
Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.