Inside Out Library · Explore

Buildings (1922)

Chicago : Engineering and Contracting Pub. Co. · leaf 576

An illustration from Buildings, 1922, leaf 576
ew of this arch from one end and to theside of one of the large masonry abutment:owers. As will be seen the roadway willlass through the arch. This roadway willDe 140 ft. above water in the clear and will carry four railway tracks. The top of thearch will be about 26-5 ft. above water andthe… … Stump Piling Machine. of steel. The contract recently let includes36,000 tons which is principally main archspan work. The bridge was designed by Gustav Linden-thai, M. Am. Soc. C. E., who associated withhimself as consulting architects Mr. HenryHornbostel of Palmer & Hornbostel, archi- tects,…

Buildings

Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.

More pictures from Buildings

More like this