Inside Out Library · Explore

Buildings (1922)

Chicago : Engineering and Contracting Pub. Co. · leaf 617

An illustration from Buildings, 1922, leaf 617
n, and asewer for the north Baden valley to be builtlater. The Baden Public Sewer—Second Sec-tion is a 14-ft. horse-shoe sewer. For thenorth branch an equal opening is left intowhich the north fork of the creek will beturned. This chamber was designed for a15-ft. earth fill at 100 lbs. per cu. ft.… … sheet piling and a small amount of concretepiling were driven along each edge and acrossthe end of the open sewer and the enclosedarea was brought up to grade with a till c riprap, after which the sewer was constructedaccording to the original design. The concrete for this section was mixed ia…

Buildings

Internet Archive · University of Illinois Urbana-Champaign · Public Domain Mark 1.0. Free to use for anything.

More pictures from Buildings

More like this