Chicago : Engineering and Contracting Pub. Co. · leaf 618
r and a portion of the ex cavation had been removed when an unusual flood in Maline ( reek washed <nit the whole levee for a considerable width and deposited forms and in front ngainM short sections of2 in. pipe concreted in the footings, \ll the reinforcement was set and wiredfrom the hack form… … Fig. 7—Crusher Plant, South wires, were closed as the placing of the con-crete proceded. The concrete was handled in the bucketspreviously mentioned. A light track was laidon the finished floor, and the buckets were car-ried on trucks from the mixer to a small der-rick, by which they were raised to…